Set up and work with shared coordinates and use Acquire or Publish coordinates to or from whichever is linkedĭon't need to mess up you current workflow thou, so I wont add more to this post.work your site in a different model (Set up coordinates, create site from DWG or CSV or tracing if you prefer).Leave your Building project template Base/Survey/IO where they are by default. Regardless of how big or small your projects are, Site and Building should be managed in two separate models. If you want your point cloud and Revit to match up with survey data it is important to make sure the point cloud is generated and coordinated with the survey data first. What I want to do is quite simple, in principle:ġ- I prepared the project template with all views centered around a single family house dummyĢ- I want to insert the Kadaster plan, to fit in my views, but with maintaining its correct doesn't make sense, sites Change from one project to the next.why would you insert a Site/Kadaster into a Project Template? Specify Coordinates at Point (Option 1) Relocate project (Option 2 - however this will require that you carry out the task twice once in plan for X&Y and once in elevation for Z) After you relocate the project you may unclip/relocate/clip the survey point. Put the PC in a RVT and Link into parent RVT and set up Shared Coordinates.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |